Special Details
Road Plan Number | Road Plan Title | Road Plan Date | |
---|---|---|---|
Road Plan Letter Size: 8.5"x11" | Road Plan Tabloid Size: 11"x17" | ||
R-28-K | *R-28-K | CURB RAMP AND DETECTABLE WARNING DETAILS | 11/08/2023 |
R-29-J | *R-29-J | DRIVEWAY OPENINGS & APPROACHES, AND CONCRETE SIDEWALK | 11/08/2023 |
R-32-F | *R-32-F | APPROACH CURB & GUTTER, DOWNSPOUTS (FOR BRIDGE APPROACH CURB AND GUTTER) | 09/20/2022 |
R-32-SD | *R-32-SD | APPROACH CURB & GUTTER DOWNSPOUTS (FOR SAFETY SHAPE BRIDGE BARRIERS & RAILINGS) | 04/24/2023 |
R-43-J | *R-43-J | LOCATION OF TRANSVERSE JOINTS IN PLAIN CONCRETE PAVEMENT | 01/04/2022 |
R-44-G | *R-44-G | CONCRETE PAVEMENT REPAIR | 09/18/2023 |
R-45-K | *R-45-K | PAVEMENT REINFORCEMENT FOR BRIDGE APPROACH | 01/04/2022 |
R-50-H | *R-50-H | LIGHT STANDARD FOUNDATION (CONCRETE BARRIER, DOUBLE FACE) | 12/12/2023 |
R-53-A | *R-53-A | TEMPORARY CONCRETE BARRIER LIMITED DEFLECTION | 08/14/2015 |
R-55-H | *R-55-H | FILLER WALLS AT BRIDGE PIER COLUMNS | 03/13/2024 |
R-56-F | *R-56-F | GUARDRAIL MEDIAN OBJECT PROTECTION | 10/10/2023 |
R-60-J | *R-60-J | GUARDRAIL TYPES A, B, BD, T, TD, MGS-8, & MGS-8D | 01/29/2024 |
R-62-H | *R-62-H | GUARDRAIL APPROACH TERMINAL TYPE 2M | 06/16/2022 |
R-63-C | *R-63-C | GUARDRAIL APPROACH TERMINAL TYPES 3M | 10/02/2023 |
R-66-E | *R-66-E | GUARDRAIL DEPARTING TERMINAL TYPES B, T & MGS | 09/14/2023 |
R-67-G | *R-67-G | GUARDRAIL ANCHORAGE, BRIDGE,DETAILS | 04/03/2024 |
R-67-SD | *R-67-SD | GUARDRAIL ANCHORAGE, BRIDGE, DETAILS (FOR SAFETY SHAPE BRIDGE BARRIERS & RAILINGS) | 04/04/2023 |
R-72-D | *R-72-D | GUARDRAIL LONG SPAN INSTALLATIONS | 08/23/2022 |
R-73-F | *R-73-F | GUARDRAIL OVER BOX OR SLAB CULVERTS | 08/01/2019 |
R-80-F | *R-80-F | GRANULAR BLANKET, UNDERDRAINS, OUTLET ENDINGS FOR UNDERDRAINS, AND SEWER BULKHEADS | 06/28/2021 |
R-88-E | *R-88-E | STEEL END SECTION | 03/07/2023 |
R-100-I | *R-100-I | SEEDING AND TREE PLANTING | 11/01/2024 |
R-110-B | *R-110-B | PAVEMENT SAFETY EDGE | 06/14/2021 |
R-112-J | *R-112-J | SHOULDER AND CENTER LINE CORRUGATIONS | 08/02/2023 |
R-126-I | *R-126-I | PLACEMENT OF TEMPORARY CONCRETE BARRIER | 08/25/2015 |
R-127-H | *R-127-H | DELINEATOR INSTALLATIONS | 08/11/2023 |
R-130-A | *R-130-A | LIGHT STANDARD DETAILS | 11/13/2024 |
21 | *21 | GUARDRAIL AT INTERSECTIONS | 06/06/2022 |
24 | *24 | GUARDRAIL ANCHORED IN BACKSLOPE TYPES 4B, 4T, & 4MGS-8 | 12/06/2022 |
99 | *99 | CHAIN LINK FENCE WITH WIRE ROPE | 12/06/2022 |
*Note:The special details in 11" x 17" pdf format are intended for inclusion in a set of construction plans. Consultants doing business with MDOT may contact their Project Manager to obtain special details.
Bridge Plan Number | Bridge Plan Title | Bridge Plan Date | |
---|---|---|---|
Bridge Plan Letter Size: 8.5"x11" | Bridge Plan Tabloid Size: 11"x17" | ||
B-21-K | *B-21-K | BRIDGE RAILING, 2 TUBE | 09/10/2024 |
B-25-L | *B-25-L | BRIDGE RAILING, AESTHETIC PARAPET TUBE | 09/09/2024 |
B-26-G | *B-26-G | BRIDGE RAILING, 4 TUBE | 09/06/2024 |
B-27-B | *B-27-B | BRIDGE RAILING, 3 TUBE WITH PICKETS | 09/11/2024 |
B-28-A | *B-28-A | BRIDGE BARRIER RAILING, TYPE 7 | 09/12/2024 |
B-29-A | *B-29-A | BRIDGE BARRIER RAILING, TYPE 6 | 09/12/2024 |
B-102-D | *B-102-D | STANDARD SLOPE PAVING DETAILS | 09/18/2023 |
B-103-F | *B-103-F | MOLDING, BEVEL, LIGHT STANDARD ANCHOR BOLT ASSEMBLY AND NAME PLATE DETAILS | 12/08/2023 |
*Note:The special details in 11" x 17" pdf format are intended for inclusion in a set of construction plans. Consultants doing business with MDOT may contact their Project Manager to obtain special details.
Expansion joint sheets and beam sheets have moved. See Miscellaneous Road, Bridge, and Lighting Details link in column at left.