MDOT - DTMB
0-Operation Guides
Click on the individual link below to download the file.
Sub-Category | Plan | Title - Download | Last Updated |
---|---|---|---|
0-Operation Guides | 1597 Form Signal Study Screening.xlsx | 1597 Form Signal Study Screening 1597 Form Signal Study Screening.xlsx (61.67 KB) |
08/27/2020 |
0-Operation Guides | EPAC Permit 4-2-21.pdf | EPAC Permit 4-2-21.pdf EPAC Permit 4-2-21.pdf (633.36 KB) |
04/02/2021 |
0-Operation Guides | EPAC Timing Parameters | EPAC Timing Parameters EPAC Timing Parameters.xlsx (18.79 KB) |
04/06/2021 |
0-Operation Guides | Electronic Traffic Control Device Guidelines | Electronic Traffic Control Device Guidelines Electronic_Traffic_Control_Device_Guidelines.pdf (8,427.93 KB) |
07/10/2020 |
0-Operation Guides | Flashing Yellow | Flashing Yellow Arrow Left-Turn Signal Guidelines mdot_signals_flashing yellow arrow guidelines.pdf (371.74 KB) |
04/20/2018 |
0-Operation Guides | Guide For Use | Traffic Signals A Guide For Their Use mdot_signal_guideforuse.pdf (592.15 KB) |
04/20/2018 |
0-Operation Guides | Left-Turn Phasing Spreadsheet - excel | Left-Turn Phasing left_turn_phasing.xls (1,120 KB) |
04/02/2021 |
0-Operation Guides | Left-Turn Phasing Spreadsheet - pdf | Left-Turn Sight Distance.pdf left_turn_sight_distance.pdf (65.34 KB) |
04/02/2021 |
0-Operation Guides | NTCIP Permit 3-31-21.pdf | NTCIP Permit 3-31-21.pdf NTCIP Permit 3-31-21.pdf (2,092.46 KB) |
03/31/2021 |
0-Operation Guides | NTCIP Timing Parameters.xlsx | NTCIP Timing Parameters.xlsx NTCIP Timing Parameters.xlsx (47.67 KB) |
03/31/2021 |
0-Operation Guides | Peak Hours Analyses.xlsm | Peak Hours Analyses.xlsm Peak Hours Analyses.xlsm (80.4 KB) |
04/02/2021 |
0-Operation Guides | Signal Timing Spreadsheet | Y & R & Ped Timing Signal Timing Spreadsheet.xls (1,029 KB) |
12/08/2020 |
0-Operation Guides | Signal Warrants Spreadsheet | Signal Warrants Signal Warrants Spreadsheet.xls (2,195 KB) |
04/02/2021 |